GrantReady · Reference

The SEAI Declaration of Works form: what it is, who signs it, where to get it

If you are searching for a Declaration of Works PDF, here is the short answer: the forms you can actually claim with are personalised to your application and arrive in the post with your Letter of Offer. There is no blank form to download, fill in and submit. This page covers the homeowner-managed Better Energy Homes route only; Solar PV, One Stop Shop and Warmer Homes use different forms and processes.

Checked against SEAI's published guidance. Last checked 4 August 2026.

Where the forms come from

SEAI generates the Declaration of Works (DOW) forms for your specific application and posts them to you with the Letter of Offer and a Request for Payment form. Each form is pre-printed with your application ID, its own unique DOW ID, your Meter Point Reference Number (MPRN), your name, the installation address and your contractor's registration details.

Source: SEAI Homeowner Application Guide, p. 15 ("You will receive a letter of offer in the post with a Declaration of Works form and Request for Payment form")

A few downloadable SEAI documents show examples of these forms, but none of them is a personalised claim form:

SEAI does not publish a replacement procedure for a lost pack, so if yours is missing, ask SEAI directly rather than substituting anything downloaded.

What is in the posted pack

A real single-measure offer pack from 2025 contained eight personalised pages, in this order: the Letter of Offer (pages 1 and 2), the Request for Payment (pages 3 and 4), the Building Energy Rating (BER) Declaration of Works (pages 5 and 6), and the measure's Declaration of Works (pages 7 and 8). Each measure you claim needs its own two-page Declaration of Works, so a pack with more measures is longer; the exact order and page count of a multi-measure pack has not been documented, so go by the pack you receive.

Source: SEAI DOW Sign Off Guide for Homeowners, pp. 3-4 (the Request for Payment images are marked "Page 3 of 8" and "Page 4 of 8")

The measure Declaration of Works, section by section

Every measure Declaration of Works carries a Date of Offer and Date of Expiry in its header, and a Cancel Measure tick-box in the top right corner. Leave that box alone unless you have decided not to go ahead with the measure; a cancelled measure's form still goes back with the claim.

Sources: SEAI Roof Insulation Quality Alert (full blank roof form) · BEH Contractor Code of Practice, p. 13

Who completes the BER Declaration of Works

The BER Declaration of Works covers the whole application, not one measure. Three parties touch it and their roles are easy to confuse:

Sources: SEAI BER Guidance for Individual Energy Upgrades, pp. 10-15 · SEAI DOW Sign Off Guide for Homeowners, p. 4

Who signs each form and when

  1. The contractor may only sign after the grant work is fully complete and compliant, and after they have been paid in full or a written payment schedule is in place. A promise to come back and finish later is not acceptable on a signed form.
  2. Every signature must be dated at the moment of signing. The "date the grant work was completed" box is a separate date and can differ from the signature date.
  3. The BER assessor completes and signs their section, and the after-works BER must be published before you submit.
  4. You check every completed section, sign each form last, complete the Request for Payment (one signature for the bank-details request and one for the payment declaration), and submit the complete set together, by email or by post.

For a single-measure claim that is six signatures across three parties. Each additional measure adds two more: yours and the contractor's nominated person's on that measure's form.

Sources: BEH Contractor Code of Practice, p. 13 · SEAI DOW Sign Off Guide for Homeowners

What gets a claim returned

The rule is printed on the forms themselves: if any form is incomplete or missing, the request for payment is rejected and all the documentation is returned to you.

SEAI's own guidance says a significant number of Declaration of Works forms come back incorrect or incomplete, and names a missing homeowner or contractor signature as the most common reason. The contractor Code of Practice lists the recurring section 2 defects: the wrong works date, missing insulation type, roof area confused with insulation depth, unexplained coverage under 100%, a top-up not stated, and product conductivity entered where the before and after U-values should be. SEAI does not publish a numeric return rate for claim packs.

The signer matters too. A form signed by someone who is not on the contractor's nominated-person list can delay or reject payment and cause the paperwork to be returned; for the contractor, SEAI's quality assurance procedure treats it as non-compliance carrying an immediate two-month sanction.

One wider number for context: in 2022, 54% of the Better Energy Homes properties SEAI inspected passed initially. The Comptroller and Auditor General notes the inspections were targeted and probably not representative of all work, and no published breakdown separates documentation problems from workmanship.

Sources: SEAI DOW Sign Off Guide for Homeowners, p. 2 · BEH Contractor Code of Practice, pp. 13-14 · BEH Quality Assurance and Disciplinary Procedure, p. 17 · Comptroller and Auditor General, 2022 report, chapter 8, Fig. 8.7

Which expiry date to use

Different SEAI pages currently give different claim windows (six months in one place, eight in another). Use the Date of Expiry printed on your own Letter of Offer and repeated on each Declaration of Works as your claim deadline. If the works are completed but the paperwork is late, SEAI's guide says you may still submit the documents with a cover letter explaining the delay; SEAI will review them and consider payment, but that is not an automatic extension or a promise to pay.

Source: your Letter of Offer; the conflict is between SEAI's BER grant page and the Homeowner Application Guide, p. 16

Check your own pack before you send it. The free guide lists every form your claim needs for your specific grants, with the signatures and supporting documents to check on each.

Open the claim checklist ›